25
30-Day Grade
F

SaskTel Centre

30-Day Average
26.8%
Over 20 days
Best Day
64.3%
Nov 21
Worst Day
0%
Nov 19
Variability
64.3%
Performance range
๐Ÿšจ

Schedule Realism

Severely Under-scheduled

Schedule is unrealistic. Needs 15%+ more time to be achievable.

Recommendation: Schedule needs major revision. Add 15%+ time or review route.

Ratio: 1.72 (actual time / scheduled time)

โš ๏ธ

System Comparison

Poor - Bottom 25%

Route ranks #46 out of 50 routes (8th percentile)

Route performance: 26.8% on-time

System median: 47.2% on-time (-20.4pp)

โš ๏ธ This route is significantly underperforming compared to the system average. Review schedule realism and stop-level reliability above for root causes.

Stop-Level Reliability by Direction

Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ†“ outbound, โ†‘ inbound).

Route Analysis

Route 25 averages 26.8% on-time performance over the last 30 days, earning a grade of F.

This route shows high variability in performance (64.3% range), suggesting external factors like weather significantly impact service quality.

View weather impact analysis โ†’