Evergreen / City Centre
Evergreen / City Centre
Schedule Realism
Severely Under-scheduledSchedule is unrealistic. Needs 15%+ more time to be achievable.
Recommendation: Schedule needs major revision. Add 15%+ time or review route.
Ratio: 5.89 (actual time / scheduled time)
System Comparison
Average - Middle 50%Route ranks #20 out of 50 routes (61th percentile)
Route performance: 51.2% on-time
System median: 47.2% on-time (+4pp)
Stop-Level Reliability by Direction
Shows how delays accumulate along each route direction. Stops are ordered from start to end of the route. Arrows indicate direction of travel (โ outbound, โ inbound).
Route Analysis
Route 43 averages 51.2% on-time performance over the last 30 days, earning a grade of F.
This route shows high variability in performance (56.7% range), suggesting external factors like weather significantly impact service quality.